LEV test report: what a thorough examination and test should give you

Updated

The report is the thing you are actually buying. It is what an inspector reads, what your insurer may ask for, and what tells you whether the extraction is protecting anyone.

What the report is for

A thorough examination and test answers one question: is the system still achieving the control it was designed to achieve? That question can only be answered against a stated intended performance. HSE guidance is that the examiner needs information about intended performance, which might be an initial appraisal or commissioning report, or for simple standalone systems the supplier's standard operating data (hse.gov.uk). A report with no benchmark is a set of readings, not a verdict.

What a usable report contains

  • Identification of the system, the processes it serves and every hood or extraction point examined.
  • The intended performance the system is being judged against, and where that figure came from.
  • Measured results at each point, with the instruments used and their calibration status.
  • A clear statement of whether adequate control is being achieved, point by point rather than only overall.
  • Defects found, with what needs doing and how urgently.
  • The date, the examiner, and a record you can retain for the 5 years COSHH regulation 9(4) requires.

Reading the verdict

Adequate control demonstrated
Every point examined performs as intended. File it, diarise the next examination inside the applicable interval, and keep up the routine checks that regulation 9(1) requires between tests.
Adequate control with observations
The system works but something is degrading: a filter near end of life, a damper drifting, a hood used differently from how it was designed. These are the cheap fixes if you do them now.
Control not demonstrated
One or more points are not achieving the intended performance. Exposure control is in doubt from the date of the test, not from the date you get round to it, so this normally means acting on the process as well as booking the repair.

What happens after a fail

  1. Deal with exposure first. That may mean stopping the affected process, moving the work, or relying on suitable respiratory protection while repairs are arranged.
  2. Get the remedial work specified. The examiner reports; the fix is separate work and is usually quoted separately.
  3. Re-test after the repair, and check at quote stage whether that visit is included or chargeable. It is one of the most common surprises on an LEV bill.
  4. Keep the failed report. The 5 year record covers examinations, tests and repairs, and the trail of what you did about a failure is the part that shows a duty taken seriously.

If you have no commissioning data at all, say so when you ask for quotes. Establishing a benchmark is real extra work, and a tester who has been told in advance will price it rather than discover it on site.

Questions, answered directly

What should an LEV test report include?

The system and every extraction point examined, the intended performance it is judged against and where that came from, measured results at each point, the instruments used, a clear point by point statement of whether adequate control is achieved, any defects with remedial actions, and a dated record you can retain for at least 5 years.

What if I have no commissioning report for my LEV?

The examiner has to establish a benchmark before they can judge performance, which takes extra time. Tell testers at quote stage so it is priced rather than discovered on site, and treat the resulting figures as the commissioning data you keep for future examinations.

Does an LEV test failure have to be reported to HSE?

A failed examination is not in itself something you report, but it does mean exposure control is in doubt from the date of the test, so the employer has to act on the process and the repair. Keep the failed report and the record of what was done: COSHH regulation 9(4) requires records of examinations, tests and repairs to be kept for at least 5 years.